Housing in Liljeholmen

Liljeholmskajen is complete – JM's last tower on the quay, K7, was finished in 2022 – and the next chapter is Marievik: the 2023 detailed plan holds around 960 homes on the office peninsula by Årstaviken, JM is building the first towers with provisional move-in from March 2028, and Klövern plans to launch sales in the first quarter of 2027. Wallenstam lets rentals at Årstaberg, and Lövholmen by Trekanten becomes a district of some 1,800 homes – but not before 2030.

We do not list individual sale listings or closing prices; those live with the brokers and the housing portals. Everything on this page is read from the developers' own pages, and the date of the last check is shown below.

Housing projects

Home counts cover the whole project, not what remains unsold right now.

Mary, Marieviks Udde

JM
Marieviks Udde

The first quarter at Marieviks Udde, where JM is building four quarters with 630 homes in total according to its project pages, plus a preschool and commercial space, on the peninsula south of Liljeholmsbron. Mary holds 135 apartments of two to four rooms in an L-shaped block designed by Wingårdh Arkitektkontor: a 27-storey tower and a seven-storey quay building, with a shared roof terrace and an orangery on top of the quay building. JM’s project page gives a preliminary move-in from March 2028, and AMF Fastigheter’s timeline for Marievik puts the first residents on the peninsula in the same month. Byggindustrin reported on 24 October 2024 that JM was under way on the peninsula ten years after buying the land, working five metres below the surface of Mälaren. The Marievik plan won legal force on 3 April 2023 and covers about 960 homes and 27,000 square metres of offices and other premises in total; Marieviksbadet next door opened in June 2025. The city says the park opposite the bath is planned to open in summer 2026, and AMF’s timeline has the temporary Marieviksparken finished in July 2026; JM writes that Plåtparken is based in Marieviksparken, right next to the quay bath, and that the park has gained more seating, green space, games and a basketball court.

In other districts:JM also builds Horisont Barkarby Södra in Barkarbystaden

135 homesOccupancy prel. from March 2028● Selling now

Rex, Marieviks Udde

JM
Marieviks Udde

The second quarter at Marieviks Udde: 128 condominiums in four stairwells around a raised green courtyard with planting and play space, a garage beneath, roof terraces on two of the stairwells and a common room for residents. Production began in the third quarter of 2025 and occupancy is expected to start in the third quarter of 2028, with completion around the turn of 2028/2029, according to Fastighetsvärlden on 26 September 2025; JM’s project page gives a preliminary move-in from September 2028. Rex makes up about two thirds of a block that also takes in the Spiran tower, according to the project page, and the block as a whole holds 256 homes over one shared garage, as JM put it in its press release of 18 June 2026 on Spiran’s construction start. Prices and unsold apartments are in JM’s unit selector on the project page.

128 homesOccupancy from Q3 2028● Selling now

Spiran, Marieviks Udde

JM
Marieviks Udde

The third production start at Marieviks Udde, announced by JM on 18 June 2026: 128 condominiums of one to four rooms in a 32-storey building at Liljeholmsbron, which JM calls the tallest residential building in southern Stockholm. Occupancy is expected in the second quarter of 2029, when completion is also scheduled, according to the press release, and the project page gives a preliminary move-in from April 2029. Sales run in stages: the first covers 42 homes on selected floors, and the second, Spiran 2 with 43 homes of one to four rooms, was open to purchase requests from JM’s VIP customers on 2–16 September 2026. Spiran and Rex together form one block of 256 homes with a shared garage. The quarters on the peninsula rise between 7 and 32 storeys, and JM states that some of the material from earlier buildings on the site, such as facade brick, art and facade sheeting, has been reused, Nordic Construction reported on 16 June 2025. Still to start are the two quarters JM is planning on the quay nearest Södermalm, according to its Marieviks Udde page.

In other districts:JM is also part of Sjöstadshöjden in Hammarby Sjöstad

128 homesOccupancy from Q2 2029● Selling now

Årstaberg

Wallenstam
Årstaberg, norr om spåren

287 rental apartments of 1–4 rooms in three buildings of 7, 9 and 10 storeys, designed by FOJAB, construction started 2024 and first occupancy in the second to third quarter of 2026. House 2 with 95 apartments and house 3 with 104 are fully let; letting of house 1, 88 apartments made up of 15 studios, 44 two-room, 22 three-room and 7 four-room flats, starts in September 2026, according to Wallenstam’s project page. The flats are let through Wallenstam’s own queue and through Stockholm’s housing agency, Bostadsförmedlingen. The block sits in the city’s Årstaberg build-out on the Liljeholmen side, about 1,000 apartments with Ikano Bostad, Besqab and Wallenstam as developers, where block 1 completes in 2026 and the last, block 3, is planned for 2029 (vaxer.stockholm, updated 4 September 2026).

In other districts:Wallenstam also builds Barkarbyporten in Barkarbystaden, with Reliwe

287 homesFirst occupancy Q2–Q3 2026● Selling now

Momentum

Klövern
Marievik, Årstaängsvägen 9

Klövern plans 255 condominiums of one to five rooms in Marievik, at Årstaängsvägen 9 and designed by Rotstein with Sandell Sandberg; the project page’s running text speaks of around 260 apartments. The project is in its planning phase with a preliminary sales start in the first quarter of 2027, and what is published is a registration of interest, not prices. Shared roof terraces with a sauna, private terraces above a hundred square metres on some apartments and BREEAM-SE Excellent certification are part of the description. AMF Fastigheter’s timeline for Marievik puts Klövern’s sales launch in February 2027, with six point blocks of 9 to 27 storeys, around 260 apartments and first occupancy in 2029.

255 homesSales start prel. Q1 2027○ Sales not yet open

Lövholmen

Skanska, Nordr, Lindéngruppen, JM och Fastighets AB Lövholmen/Järntorget
Lövholmen, mellan Trekanten och Liljeholmsviken

The closed-off industrial area by Trekanten is to become around 1,800 homes with three preschools and workplaces on ground floors; no stand-alone office building is included and the Färgfabriken art hall stays. The property owners are Skanska, Nordr, Lindéngruppen, JM and Fastighets AB Lövholmen/Järntorget. Skanska and Heidelberg Materials formed a joint company on 18 March 2026, owned half each, to develop Lövholmen together; the cement plant is to move to Energihamnen in Värtan before anything can be built. The city held consultation 5 September–16 October 2023 and plans review in the fourth quarter of 2027 and adoption in the third quarter of 2029 (vaxer.stockholm, updated 25 August 2026). No developer is selling anything here yet.

approx. 1800 homesPlan adoption scheduled for Q3 2029○ Planned

Every fact checked against the developers' own pages on 2026-09-26 or later

Coming phases

The city's timetables for Marievik, Lövholmen, Liljeholmen centre and the metro's yellow line are on the building projects page.

Building projects in Liljeholmen

Prices in the area

Liljeholmen is reported in the open statistics as part of Hägersten-Liljeholmen.

Price per m²
78 428 kr/kvm
Price development
+7.9 %
Homes sold
2 657

Källa: Svensk Mäklarstatistik AB · updated 2026-09-08